Ads
  

March 2014 Archive


SLIM - A Mathematical Model
SLIM - A Mathematical Model

With regression modeling, the stress is on constructing a formula that best represents scattered data points. In mathematical modeling, the stress is on matching the data to the form of an existing mathematical function. In the early 1960s, Peter V. Norden of IBM concluded that

Tags life cycle, software estimating, productivity level, software size

Estimating Duration and Cost - Summary
Estimating Duration and Cost - Summary

Estimating product size, staff effort, project schedule, and cost are inextricably entwined during the project planning process, which takes place for the first time near the beginning of the project life cycle and many times thereafter, generally at the end of each major phase.

Tags life cycle, software project, software development, software estimation, software product, estimating cost

Assigning Resources
Assigning Resources

When you have a WBS list of modified activities that match the life cycle you have selected for a project, you are ready to allocate resources to them. This should be easy, right? The database people get the database assignments, and the testers get the testing assignments. Not so

Tags life cycle, deliverables, software project, software product

Page 1 of 1 Previous 1 Next
The contents available on this website are copyrighted by TechPlus unless otherwise indicated. All rights are reserved by TechPlus, and content may not be reproduced, published, or transferred in any form or by any means, except with the prior written permission of TechPlus.
Copyright 2017 SPMInfoBlog.
Designed by TechPlus