Ads
  

Competencies

Creating the Work Breakdown Structure
Creating the Work Breakdown Structure

If you have obtained a project charter and an excited customer, why go to the trouble to build a work breakdown structure? After all, aren't you a software engineering professional? The work breakdown structure (WBS) is the heart of a project plan, as most of the other parts of a

Tags project charter, project plan, software product, life cycle, competencies

Page 0 of 1 Previous 1 Next
The contents available on this website are copyrighted by TechPlus unless otherwise indicated. All rights are reserved by TechPlus, and content may not be reproduced, published, or transferred in any form or by any means, except with the prior written permission of TechPlus.
Copyright 2017 SPMInfoBlog.
Designed by TechPlus