Ads
  

Project Planning

The SEI CMM and Estimating
The SEI CMM and Estimating

The Software Engineering Institute (SEI) Capability Maturity Model (CMM) introduced in “Selecting Software Development Life Cycles” supports activities explained in this section. Software project planning is a key process area for maturity Level 2, the repeatable level. Sizing

Tags software products, project planning, software project, life cycle

The SEI CMM and Estimating
The SEI CMM and Estimating

The Software Engineering Institute (SEI) Capability Maturity Model (CMM) supports activities explained here. Software project planning is a key process area for maturity Level 2, the repeatable level. The KPAs in Level 2 are a necessary foundation for the mature processes that

Tags software estimation, project planning, product development, life cycle, cost estimation

Page 0 of 1 « Previous 1 Next »
The contents available on this website are copyrighted by TechPlus unless otherwise indicated. All rights are reserved by TechPlus, and content may not be reproduced, published, or transferred in any form or by any means, except with the prior written permission of TechPlus.
© Copyright 2017 SPMInfoBlog.
Designed by TechPlus